Contracts concluded with Azersu JSC

Contracts concluded with “Azersu” JSC:

Construction of Office building for Goychay JSC and Agdash JSC

INFORMATION:

The executed construction works were financed by state budget.

The works started on November of 2008 and completed on November of 2009 with execution of high quality and in accordance to the drawings.

Main executed  works: construction of office building, boiler house for each enterprise, improvement works of area

70 specialist and workers, 4  excavators, 2  tractors, 6  lorries, 2  cranes, 6 concrete mixers were involved for construction works.


Construction of Water Intake Facilities in  Agdash rayon center

INFORMATION:

The executed construction works were financed by state budget.

The works started on November of 2008 and completed on November of 2009 with execution of high quality and in accordance to the drawings.

Main executed  works: construction of 3 artesian wells (depth 195m), water intake chamber, pumpstation, chlorination plant, laboratory building,   water reservoir 1x2000m3; installation of  3957m PVC pipe with diameter of D=160-377mm, 2 860m polyethylene pipe with diameter of D=377mm; improvement works of area.

94 specialist and workers, 4  excavators, 2  tractors, 5  lorries, 1  crane, 5 concrete mixers, welldrilling machine were involved for construction works


Construction of Water Intake Facilities in  Goychay rayon center

INFORMATION:

The executed construction works were financed by state budget.

The works started on November of 2008 and completed on November of 2009 with execution of high quality and in accordance to the drawings.

Main executed  works:  construction of 3 artesian wells (depth 195m), water intake chamber, pumpstation, chlorination plant, laboratory building,   water reservoirs 1x500m3 and 1x2000m3; renovation of  water reservoir 1x1000m3, installation of  7035m steel pipe with diameter of D=160-377mm; improvement works of area

109 specialist and workers, 5  excavators, 2  tractors, 5  lorries, 1  crane, 6 concrete mixers, welldrilling machine were involved for construction works


Oguz-Gabala-Baku Water Line Project

Construction of Collection System, Water Reservoirs, Chlorination Plant, Laboratory and other structures for  establishing of Water Intake Structure in frame of Oguz-Gabala-

INFORMATION:

The executed construction works were financed by state budget.

The works started on August of 2009 and completed on December of 2010 with execution of high quality and in accordance to the drawings

Value of contract – 68 015 650 manat.

Main executed  works:  Construction of pavilions for 100 piece wells, chlorination building, transformer building, water distribution chamber,  laboratory building, water pump station building, sewer pumpstation building,  administrative building, Passage point, material store house, mechanical workshop, inside technological pipes, water reservoirs with capacity of 10000m3 each, improvement of area, installation of downlisted pipes with following diameters:

Æ2000 mm – 21 839 m;

Æ1600 mm – 3 048m;

Æ1400 mm –  2 781m;

Æ1200 mm – 1 000m;

Æ1000 mm – 3 600m;

Æ800 mm – 2 800m;

Æ600 mm – 11 056m;

Æ500 mm – 3 090m;

Æ400 mm – 7 363m;

Æ300 mm – 12 381m

227 specialist and workers, 20  excavators, 5  tractors, 30  lorries, 5  crane, 15 concrete mixers, welldrilling machine were involved for construction works


Construction of Water Supply Intake and Facilities for Shamakhi Rayon

INFORMATION:

The executed construction works were financed by Development Bank.

The works started on April of 2010 and completed on December of 2011 with execution of high quality and in accordance to the drawings

Value of contract – 12 807 125manat.

Main executed  works:  Construction of horizontal water collectors, chlorination plant, pump station, water reservoir 500m3, passage point; installation of pipelines from pump station to 1,2,3 and 4th water reservoirs from d=325mm steel pipe – 1330m.

121 specialist and workers, 9  excavators, 3  tractors, 12  lorries, 2  crane, 9 concrete mixers were involved for construction works


Construction of Water Supply and Sewerage Networks (total length 15000m) on 3 street of Shamakhi city

INFORMATION:

The executed construction works were financed by state budget.

The works started on August of 2011 and completed on September of 2011 with execution of high quality and in accordance to the drawings

Value of contract – 4 500 000 manat.

Main executed  works: construction of water pipe line D=50-355mm – 7 417m; construction of sewer pipe line D=200-300mm – 8 093m; reinstatement of asfhalt road -20 564m2.

74 specialist and workers, 7  excavators, 2  tractors, 12  lorries, 2  crane, compactor were involved for construction works


Construction of Waste Water Treatment Plant and Related Structures for Shamakhi Rayon

INFORMATION:

The executed construction works were financed by INternational Bank for Reconstruction and Development.

The works started on April of 2012 and are continuing, completion of contract are expected on May 2015

Value of contract – 9 401 601US$ .

Main executed  works: construction of pre teratment units, biological treatment units,chemical treatment units,  outlet structures, sludge handling units, administrative buildings

121 specialist and workers, 9 excavators, 3  tractors, 12  lorries, 2  crane, 9 concrete mixers were involved for construction works


Construction of Water Supply Systems and Sewerage Collectors for Shamakhi Rayon

INFORMATION:

The executed construction works were financed by International Bank for Reconstruction and Development.

The works started on May of 2012 and are continuing, completion of contract are expected on December 2014

Value of contract – 39 089 440 US$ .

Main executed  works: water house connections – 5 400 pieces, sewer house connections- 3 700 pieces, construction of water line and network from D=20:355mm HDPE pipes – 125 740m; construction of sewer line and network from D=200:800mm HDPE pipes – 116 675m; construction of main transmission line D=325mm – 5 096m, construction of 6x1000m3 and 2x750m3 water reservoirs, construction of other auxillary buildings and water reservoir areas

183 specialist and workers, 14 excavators, 4  tractors, 13  lorries, 3  crane, 10 concrete mixers were involved for construction works


Construction of Water Intake Facilities and Rehabilitation of Water Supply and Sewerage Networks in Beylagan Town

INFORMATION:

The executed construction works were financed by Asian Development Bank.

The works started on August of 2012 and are continuing, completion of contract are expected on December 2014

Value of contract – 47 600 928 US$ .

Main executed  works:

water house connections – 42 206m, sewer house connections – 6 056 pieces, the project includes: water supply PE pipes – 90489 m, sewer system corrugate pipes – 81530 m, r/concrete inspection manholes and house connections, construction of water reservoirs with capacity of 500 m³, water intake structures, water pump station building, pressured pipe line PE 450×40,9 PN16 – 8447 m, 5 subartesian wells, renovation of 2 x2000 m³ water reservoirs, sewer pump station, chlorination plant, administrative building.

207 specialist and workers, 15 excavators, 4  tractors, 15  lorries, 3  crane, 10 concrete mixers were involved for construction works


Design and Reconstruction of Water Supply System and Sewerage Networks for Imishli Rayon

INFORMATION:

The executed construction works were financed by state budget

The works started on August of 2011 and completed on July 2014 with execution of high quality and in accordance to the drawings.

Value of contract – 66 500 000 manat .

Main executed  works:

water house connections – 9523 pieces, construction of water supply lines from PE pipes- 167 380 m, constructio of sewer system from d=630mm corrugated pipes – 4 000 m, construction of main transmission line from d=630mm pipes – 29 950m,  construction of r/concrete inspection manholes and house connections. Beside this, construction of 2×2500 m³ and 1x1500m3 water reservoirs, water intake structure, pump station building, subartesian wells, chlorination plant, administraive building.

165 specialist and workers, 10 excavators, 3  tractors, 14  lorries, 2  crane, 10 concrete mixers were involved for construction works


Design and construction of  water supply and sewerage lines of “Azersu” JSC, construction of DN300mm sewer line in Sovkhoz street No 2

INFORMATION:

The executed construction works were financed by state budget

The works started on December of 2012 and completed on December 2013 with execution of high quality and in accordance to the drawings.

Main executed  works:

construction of sewer line from D=160:600mm pipes – 4 167m

55 specialist and workers, 2 excavators, 1  tractors, 3 lorries, 1  crane were involved for construction works


Construction of +41 Kurdekhani water reservoir and distribution water line network which its reservoir provides the  area with water.  Construction of potable water network system in Pirshagi settlement

INFORMATION:

The executed construction works were financed by state budget

The works started on December of 2012 and completed on December 2013 with execution of high quality and in accordance to the drawings.

Main executed  works:

construction of water line from D=110:280mm pipes – 14 634m

55 specialist and workers, 2 excavators, 1  tractors, 3 lorries, 1  crane were involved for construction works